Gordie Howe bridge to cost $5.7 billion; set to open by end of 2024

Crown corporation overseeing the construction of the Gordie Howe International Bridge

A new bridge that will span Canada’s busiest border crossing with the United States is expected to cost $5.7 billion.

The Crown corporation overseeing the construction of the Gordie Howe International Bridge says the price tag includes the costs of designing, building, operating and maintaining the bridge and its ports of entry on both sides of the border for 30 years.

The bridge authority says the cost would have been more than $6.2 billion if the Canadian government had decided not to partner with a private-sector consortium and to foot the entire bill itself.

Construction of the six-lane, 2.5-kilometre cable-stayed bridge will provide a second span connecting Windsor, Ont., and Detroit — but it won’t be open to traffic until the end of 2024.

The Canadian government expects to pay for the bridge by collecting tolls. It agreed years ago to take on the cost of the project in order to bypass Congress, which had refused to sign off on American funding.

About one-quarter of all goods traded annually between Canada and the U.S. passes through the Detroit-Windsor corridor.

The Canadian Press

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

New intersection coming for Hwy. #2A near grain terminal

G3 Canada will begin new intersection in 2020

Franchises a great option for business-minded

BMO expert gives brief look at 2020

County of Wetaskiwin transfer donated land to Scouts Canada body

A.L. Siler originally asked county to hold land in trust in 1972

Good Neighbour award presented at Lakedell Ag Society AGM

Meryln Fontaine Memorial presented to Tammy Southern

Wetaskiwin RCMP seeking witnesses to car-jacking

Armed theft resulted in two subjects facing multiple charges

Blair says RCMP have met Wet’suwet’en conditions, so barricades should come down

The Wet’suwet’en’s hereditary chiefs oppose the Coastal GasLink project

Federal minister pledges to meet Wet’suwet’en chiefs in B.C. over natural gas pipeline

The Wet’suwet’en hereditary chiefs say they are visiting Mohawk territory

Pipeline dispute: Tories put no-confidence motion on House of Commons agenda

Conservatives say they have no confidence in the Trudeau government to end the rail blockades

Blockade on CN rail line in Edmonton removed, injunction granted

The blockade consisted of wooden pallets on the tracks and signs that say ‘No Consent’

Canadians aboard coronavirus-ridden cruise ship to return home tonight

Among the infected are 47 Canadians who will have to remain in Japan for treatment

Carbon risk for Alberta’s public pension manager questioned

AIMCo says nearly $115 billion invested in carbon-intensive industries is on par with other funds

Worker, shocked at future Amazon warehouse in Nisku, has died: family

Colton Quast, 25, was taken to hospital and put in a medically induced coma

Blockade supporting Wet’suwet’en hereditary chiefs on rail line in Edmonton

‘Cuzzins for Wet’suwet’en’ post pics of wooden crates on line, signs saying ‘No Pipelines on Stolen Land’

Higher costs should kill Trans Mountain pipeline, federal opposition says

Most recent total was $12.6 billion, much higher than a previous $7.4-billion estimate

Most Read